Evaluation and Mapping of the Impact of Factory Development on Road Network Traffic in Mojokerto

Yoga Pratama Wijianto (1), Hendrata Wibisana (2), Aulia Dewi Fatikasari (3)
(1) Civil Engineering Department, Faculty of Technology and Science, Universitas Pembangunan Nasional “Veteran” Jawa Timur, East Java, Indonesia
(2) Civil Engineering Department, Faculty of Technology and Science, Universitas Pembangunan Nasional “Veteran” Jawa Timur, East Java, Indonesia
(3) Civil Engineering Department, Faculty of Technology and Science, Universitas Pembangunan Nasional “Veteran” Jawa Timur, East Java, Indonesia
Fulltext View | Download
How to cite (AJARCDE) :
Wijianto, Y. P., Wibisana, H., & Fatikasari, A. D. (2026). Evaluation and Mapping of the Impact of Factory Development on Road Network Traffic in Mojokerto. AJARCDE (Asian Journal of Applied Research for Community Development and Empowerment), 10(2), 232–233. https://doi.org/10.29165/ajarcde.v10i2.1015

The growth of industrial estates in the Mojokerto region contributes positively to the economy but has negative impacts on the road network, degrading its performance. Factory operational activities, particularly during shift changes, result in sudden traffic loading (shock loading) and significant mixed traffic on access roads. This study aims to evaluate the traffic impact of factory development on the performance of surrounding roads. Data collection was conducted through primary surveys (traffic volume, side friction, and road geometry) and secondary data. Road performance analysis follows the 2023 Indonesian Highway Capacity Manual (PKJI) to determine Capacity (C) and Degree of Saturation (DS), followed by an ANOVA statistical test and spatial mapping in QGIS. The ANOVA results (p-value < 0.05) confirmed a significant difference among the five factory locations in terms of volume, side friction, and degree of saturation. Spatial mapping of the Level of Service (LoS) revealed significant polarization in existing conditions. The most critical conditions are concentrated in the northern area (PT Mertex Indonesia, PT Mago Pasifik Abadi, and PT Ajinomoto Indonesia), with DS values exceeding 1.0. The southern area (PT Sunrise Steel) is in a transitional phase approaching saturation (DS 0.76), characterized by very high side friction due to frequent employee crossings, logistics vehicle activity, and on-street parking.Conversely, the city roads around PT Intidragon Suryatama are the only areas with stable and smooth traffic performance, with a DS value below 0.50. The resulting thematic map provides a comprehensive visual representation of the current congestion point distribution as a foundation for mitigating industrial traffic impacts


Contribution to Sustainable Development Goals (SDGs):
SDG 9: Industry, Innovation, and Infrastructure
SDG 11: Sustainable Cities and Communities
SDG 13: Climate Action

[1] H. Wibisana, “Indeks Tingkat Pelayanan Jalan Berbasis Model Linier di Ruas Jalan Raya Kertajaya Indah Surabaya,” 2009.

[2] O. Z. Tamin, “Analisis Dampak Lalulintas (Andall) 1.”

[3] J. Sumajouw, B. F. Sompie, and J. A. Timboeleng, “Analisis Dampak Lalu Lintas (Andalalin) Kawasan Kampus Universitas Sam Ratulangi,” 2013.

[4] W. Wahab, L. Sentosa, M. Sebayang, M. Jurusan, T. Sipil, and D. Jurusan, “Analisis Nilai Pertumbuhan Lalu Lintas Dan Perkiraan Volume Lalu Lintas Dimasa Mendatang Berdasarkan Volume Lalu Lintas Harian Rata-Rata (Studi Kasus Ruas Jalan Sp. Lago-Sorek /Jalan Lintas Timur),” 2015.

[5] P. Kembali Perkerasan Jalan Kaku Dengan et al., “JURNAL FONDASI , Volume 2 Nomor 2 2013 Jurusan Teknik Sipil Universitas Sultan Ageng Tirtayasa | 142 Metode Bina Marga 2003 Dan Aashto 1993 (Studi Kasus Ruas Jalan Maja-Citeras).”

[6] A. Syahri Al Hikmi, T. Aziz Jiddan, M. Irkhammudin Alma?ruf, P. Teknik Sipil, F. Sains dan Teknologi, and U. Sunan Ampel Surabaya, “Analisis Kinerja Ruas Jalan Perkotaan (Studi Kasus: Ruas Jalan Rungkut Industri Raya),” 2024.

[7] D. T. Abdul Ghony L, B. Suprapto, and A. Rachmawati, “Studi Perencanaan Tebal Perkerasan Kaku ( Rigid Pavement ) Pada Ruas Jalan Ngoro-Pekukuhan ( Sta 3 + 000-13 + 000 ) Kabupaten Mojokerto”.

[8] Y. D. Subekti and H. T. Tjendani, “Analisis index kerusakan Jalan Rigid Pavement dengan metode Pavement Condition Index (PCI) pada Jalan Lebaksono – Jalan Purwojati Ngoro, Kabupaten Mojokerto,” Jurnal Teknik Industri Terintegrasi, vol. 7, no. 4, pp. 2502–2510, Oct. 2024, doi: 10.31004/jutin.v7i4.37248.

[9] A. Dewi Fatikasari and N. D. Puspitasari, “ROAD PERFORMANCE ANALYSIS USING PKJI 2014 METHOD (CASE STUDY?: TROSOBO-KLETEK ROAD, SIDOARJO DISTRICT).” [Online]. Available: https://www.google.com/maps

[10] I. Cahyono, S. Arfaah, U. Hifdhia, M. Hasib Al Isbilly, and R. Hidayat, “Dampak Aktifitas Samping Jalan Terhadap Kinerja Ruas Jalan Surodinawan Kota Mojokerto,” Nucleus Journal, vol. 3, no. 2, pp. 82–90, Nov. 2024, doi: 10.32492/nucleus.v3i2.3203.

[11] Kementerian Perhubungan Republik Indonesia. (2006). Peraturan Menteri Perhubungan Nomor KM 14 Tahun 2006 tentang Manajemen dan Rekayasa Lalu Lintas di Jalan. Jakarta: Kementerian Perhubungan.

[12] H. Wibisana and S. Zainab, "Analisa Kepadatan Ruas Jalan di Kecamatan Rungkut dengan Pemetaan Sistem Informasi Geografis,", Jurnal Sains dan Teknologi EMAS, Vol. 18, No. 3, Agustus 2008.

[13] Pradana, A. H. (2019). Tingkat layanan ruas jalan di kawasan pabrik GSI Sukabumi. Jurnal Student Teknik Sipil, 1(1).

[14] I. Kuswanto1 and A. Utomo2, “Analisis Kinerja Ruas Jalan Mojopahit Selatan Kota Mojokerto”. Seminar Keinsinyuran, vol. 1, no. 1, pp. 543-548, 2021.

[15] A. F. S. Naja, I. Sholichin, A. D. Fatikasari, and A. D. Alfiansyah, "Kajian Perubahan Nilai EMP Terhadap Kinerja Ruas Jalan Perkotaan Berdasarkan PKJI 2023," Jurnal Gradasi Teknik Sipil, vol. 9, no. 2, pp. 121-128, 2025.

[16] S. Kasus, S. Empat Jalan Raya By Pass Pisang, K. Pauh, and K. Padang Sayidah Hilmi Najla, “Analisis Kinerja Lalu Lintas Pada Simpang Empat By Pass Pisang Menggunakan Metode Pkji 2023.”

[17] S. Direktorat Jenderal Bina Marga, P. Direktur di Direktorat Jenderal Bina Marga, P. Kepala Balai Besar, B. Pelaksanaan Jalan Nasional di Direktorat Jenderal Bina Marga, and P. Kepala Satuan Kerja di Direktorat Jenderal Bina Marga, “D I R E K T O R A T J E N D E R A L B I N A M A R G A.”

[18] Direktorat Jenderal Bina Marga. (1997). Manual Kapasitas Jalan Indonesia (MKJI). Jakarta: Departemen Pekerjaan Umum.

[19] Yoga Alvian Pratama and Amri Gunasti, “Analisis Perbedaaan Volume Kendaraan pada Jam Puncak Sore Hari di Simpang Wirolegi Melalui Uji One-Way ANOVA Berbasis SPSS,” Venus: Jurnal Publikasi Rumpun Ilmu Teknik , vol. 3, no. 6, pp. 267–275, Dec. 2025, doi: 10.61132/venus.v3i6.1243.

[20] Kaisar, A. (2016). Analisis kinerja lalu lintas jalan pada jaringan jalan arteri di Kota Makassar berbasis SIG Skripsi, Universitas Hasanuddin.

[21] A. Cempana et al., “Pemetaan Kerusakan Jalan Berbasis Sistem Informasi Geografis (GIS) Pada Ruas Jalan Tamalanrea Raya Kota Makassar.”

Downloads

Download data is not yet available.